Asphalt transportation and storage

2024-06-28 11:32

When transporting to the transit site, timely replace the damaged asphalt, and replace the inner membrane and outer woven bag at the same time. Avoid rough loading and unloading during handling and transportation, avoid large impacts, collisions, and control the distance between the hopper and the loading and unloading surface when the loader is loading, not more than 1.5 meters, especially in winter when the temperature is lower than 0 degrees. It must be handled gently. The packaging bag is resistant to aging for 6 months outdoors. In Tibet, Qinghai, Xinjiang and other high-altitude areas (above 2500 meters above sea level), the storage bags should be covered with a layer of greenhouse film and a layer of opaque tarpaulin when stored outdoors. Avoid rain and exposure, and resist aging for 6 months. During the storage process, the asphalt cargoes are stacked in a timely manner at the warehouse, and covered in a timely manner. The covering period does not exceed 24 hours after unloading. Palletizing requirements: The width of the bottom of the stack is not greater than 6 meters, and the height is not higher than 1.8 meters. Gold tower shape), the length of the pallet is unlimited. Require rainwater to be discharged in a timely manner, to avoid rainwater deposition under the pallet, and regularly check the tarpaulin cover to ensure that the cover is tight. When the air temperature is less than 0 ℃, it should be handled gently during transportation, so as to avoid damage to the bag due to the hard asphalt, causing damage to the inner membrane and outer bags, causing the asphalt to flow out and causing pollution. Try to avoid loading and unloading in the morning and evening when the temperature is low, and choose to load at noon and when the temperature is high in the afternoon. It is forbidden to drag and other acts that cause damage to the bag body. Do not use a loader or other mechanical shovel when unloading. When used at the construction site, remove the woven bag and strapping rope. After the asphalt is heated to the melting temperature, it should be properly stirred to fully melt the inner membrane. So as not to enter the melting tank, block the asphalt output pipeline, and arouse the construction progress.

RELATED NEWS

Asphalt transportation and storage

When transporting to the transit site, timely replace the damaged asphalt, and replace the inner membrane and outer woven bag at the same time. Avoid rough loading and unloading during handling and transportation, avoid large impacts, collisions, and control the distance between the hopper and the loading and unloading surface when the loader is loading, not more than 1.5 meters

2024-06-28


Use of packaging bags

This packaging bag is divided into mechanical and manual packaging bags. For the mechanical packaging bags, because it is automatically controlled, the asphalt flow rate is reasonably controlled during the process of setting the asphalt filling process to avoid excessive speed and eroding the bottom of the packaging bag.

2024-06-28